Strongford STW Pipe Rack

Pipe rack design and installation.
HL Engineering won the tender to provide NMCN with a cross site pipe rack on the new THP system being installed at Strongford STW for Severn Trent.

We had the aspect of fully designing the structure and providing calculations to our client along with a very detailed installation program that had to be adhered to throughout the project.

Project Partner

Key Highlights

Supply and install cross site pipe rack
Fully Galvanised structural steel
Manufactured to CE Standard EX Class 2
Installed on time and budget

Key Highlights

Supply and install cross site pipe rack
Fully Galvanised structural steel
Manufactured to CE Standard EX Class 2
Installed on time and budget

Have a project for us?

Contact our specialists for further insights into our services and how we can help you

Contact Us

Please feel free to call us on 01724 279176 or use the enquiry form below and we’ll contact you…